UPS Requirement Checklist

Collect the load, electrical, runtime, battery, site and project information needed before UPS selection or replacement.

Application and buyer

  • Buyer type and local project responsibility
  • Application and critical equipment
  • New project, replacement or expansion
  • Destination country and expected timeline

Load and electrical data

  • Measured load in kW and kVA
  • Load type, startup behavior and expected growth
  • Input/output phase and nominal voltage
  • Frequency, generator and known power-quality conditions

Runtime and battery

  • Required backup time and operating objective
  • Internal or external battery direction
  • Existing DC voltage and battery configuration, if applicable
  • Lead-acid or compatible lithium review

Site and project scope

  • Installation dimensions, access route and environment
  • Bypass, redundancy, monitoring and communication requirements
  • Local installation, commissioning and maintenance responsibility
  • Required documents, standards, labels and packaging