UPS Requirement Checklist
Collect the load, electrical, runtime, battery, site and project information needed before UPS selection or replacement.
Application and buyer
- Buyer type and local project responsibility
- Application and critical equipment
- New project, replacement or expansion
- Destination country and expected timeline
Load and electrical data
- Measured load in kW and kVA
- Load type, startup behavior and expected growth
- Input/output phase and nominal voltage
- Frequency, generator and known power-quality conditions
Runtime and battery
- Required backup time and operating objective
- Internal or external battery direction
- Existing DC voltage and battery configuration, if applicable
- Lead-acid or compatible lithium review
Site and project scope
- Installation dimensions, access route and environment
- Bypass, redundancy, monitoring and communication requirements
- Local installation, commissioning and maintenance responsibility
- Required documents, standards, labels and packaging