TITAN Series Three-Phase Online UPS

Three-phase online UPS direction for server rooms, small and medium data centers, telecom, industrial control, commercial facilities, replacement and long-runtime projects.

Product overview

Three-phase online UPS direction for server rooms, small and medium data centers, telecom, industrial control, commercial facilities, replacement and long-runtime projects.

Capacity, input/output data, battery arrangement, dimensions, interfaces and certification are to be confirmed by model. Please submit the electrical and application requirement for selection.

Suitable applications

  • Server rooms and small data centers
  • Telecom and network systems
  • Industrial control and commercial facilities
  • UPS replacement and long-runtime projects

Typical project situations

  • New three-phase critical-power project
  • Replacement where the existing electrical path must be reviewed
  • Capacity, redundancy or runtime expansion planning

Available configuration directions

  • High-frequency online UPS by confirmed model
  • External battery and long-runtime direction
  • Parallel, bypass and monitoring options when supported

Availability is confirmed according to the project configuration and approved model list.

Information required before selection

  1. Measured load and load characteristics
  2. Input/output phase and voltage
  3. Existing UPS, bypass and distribution arrangement
  4. Required runtime and battery preference
  5. Redundancy or parallel objective
  6. Generator, monitoring and site conditions

Technical considerations

  • Electrical specifications are confirmed according to the selected model and current product revision.
  • Battery DC voltage, charger current and recharge expectation must be reviewed together.
  • Replacement projects require confirmation of cabling, bypass, protection and available space.

Documentation and OEM support

  • Project requirement review
  • UPS, battery cabinet and runtime matching
  • Commercial proposal, checking, documents and shipment coordination

Certification and shipping documentation are confirmed according to the selected model and destination.

Available product documents

These files apply only to the stated model scope. Confirm the exact model, revision, electrical configuration and destination before using a document for procurement.

Project limitations

  • No universal capacity, efficiency, overload or redundancy claim is made.
  • Final suitability depends on the selected model and confirmed electrical conditions.

Related applications

Buyer support paths

Related project solutions

Information to prepare

Related insights

Frequently asked questions

What information is required before selecting TITAN Series?

Measured load and load characteristics; Input/output phase and voltage; Existing UPS, bypass and distribution arrangement; Required runtime and battery preference; Redundancy or parallel objective.

Can the final specification be confirmed from this page alone?

No. The selected model, electrical configuration, battery system, documents and destination requirements must be confirmed in writing.

How is battery runtime confirmed?

Runtime is reviewed from the measured load, UPS DC system, complete battery configuration, charger, operating conditions and the required backup objective.

Can ZYKEVO support OEM or white-label supply?

OEM label, artwork, packaging and documentation coordination may be available for suitable projects after the model and commercial scope are confirmed.

Field References

TITAN Series Field References

Representative installation and integration images support project conversations; model, customer and performance details remain subject to confirmation.

TITAN UPS beside an open external battery cabinet in a field reference image
UPS batteries and cabinets

Three-Phase UPS with Battery Cabinets

Representative TITAN Series installation with external battery cabinets for extended backup applications.

View TITAN Series
TITAN 40kVA UPS cabinet shown in an installed room reference image
Three-phase UPS

TITAN 40kVA UPS field reference

TITAN Series three-phase UPS shown in an on-site equipment environment.

View TITAN Series
TITAN 80kVA UPS cabinet shown beside site equipment in a reference image
Three-phase UPS

TITAN 80kVA UPS field reference

TITAN Series three-phase UPS shown in an on-site equipment environment.

View TITAN Series
View Field References

Have a UPS or battery project?

Leave your name, phone or WhatsApp, email, country and a short message. We will review it and get back to you.