High-Voltage Lithium Battery Requirement Checklist
Collect the UPS DC, charger, load, runtime, BMS, protection, communication and destination inputs required for lithium matching.
UPS identity
- UPS brand and exact model
- Rated capacity
- Input and output voltage
- Manual, nameplate and battery-setting information
DC and charging
- DC bus or operating-voltage window
- Minimum UPS DC operating voltage and low-battery shutdown threshold
- Existing battery quantity and string arrangement
- Center-tap or two-wire full-bus structure
- Charging voltage and available charging current
- Restart and recovery behavior after battery protection
Battery duty and interfaces
- Measured load and required backup time
- BMS communication protocol or dry-contact requirement; a physical CAN or RS485 port does not confirm protocol compatibility
- Breaker, contactor, fuse, cable and emergency isolation
- Cabinet or rack arrangement
Site and destination
- Installation environment and available space
- Local commissioning and service capability
- Destination country and applicable standards
- Required shipping, certification and project documents
Related project resources
Have a UPS or battery project?
Leave your name, phone or WhatsApp, email, country and a short message. We will review it and get back to you.